华为MA5680T交换机,SmartAXMA5680T华为OLT设备,华为传输设备.系列OLT
SmartAX MA5680T/MA5683T/MA5608T设备是华为技术有限公司推出的GPON/EPON一体化光接入产品。
具有**高汇聚交换能力,3.2T背板容量,960G交换容量,512K MAC地址容量,较大支持44路10 GE或 768个GE接入。
三种规格的软件版本和用户板完全兼容,节省备件种类和数量、降低维护成本。
关键特性
高可靠性:支持OLT双机热备份、异地容灾、升级业务不中断,完备的Qos功能,端到端高可靠设计;
多场景接入:支持多种E1专线接入,支持Native TDM或CESoP/SAToP功能、E-LAN 功能,支持IPTV用户无收敛接入;
平滑演进:EPON/GPON/10G PON/40G PON共平台,支持平滑演进,满足**带宽接入;支持IPv4/IPv6双栈;
绿色节能:支持空闲单板自动下电,风扇智能调速,有效降低闲时功耗
技术规格
参数
MA5680T(ETSI)
MA5680T(IEC)
MA5683T
MA5608T
高×宽×深(mm)
490×275.8×447.2
442×275.8×441.7
442×283.2×263.9
442×244.5×88.1
运行环境
温度:-25℃~+55℃
湿度:5%~95%
温度:-40℃~+65℃
湿度:5%~95%
温度:-40℃~+65℃
湿度:5%~95%
电源参数
-48V直流输入
工作电压范围: -38.4 V~ -72 V
支持双电源保护
直流供电:-38.4V~-72V
交流供电:100V~240V
支持双电源保护
背板总线交换容量
3.2Tbit/s
1.5Tbit/s(H801MABO)
2Tbit/s(H802MABO)
720Gbit/s
接入容量
128×10G EPON
128×10G GPON
256×EPON
256×GPON
768×P2P FE
768×P2P GE
112×10G EPON
112×10G GPON
224×EPON
224×GPON
672×P2P FE
672×P2P GE
48×10G EPON
48×10G GPON
96×EPON
96×GPON
288×P2P FE
288×P2P GE
16×10G EPON
16×10G GPON
32×EPON
32×GPON
96×P2P FE
96×P2P GE
接口种类
上行接口:10GE光,GE光/电
业务接口:10G GPON,10G EPON,EPON,GPON,P2P FE光口,P2P GE光口
系统性能
二层/三层线速转发
支持Static route/RIP/OSPF/MPLS
BITS/E1/STM-1/Ethernet 时钟同步/1588v2/1PPS+ToD等时钟同步方
GPON 较大支持1:128分光比
10G PON较大支持1:256分光比
GPON较大支持60km逻辑距离
XG-PON较大支持100km逻辑距离
详细参数
主要参数
产品类型 百兆以太网交换机
应用层级 三层
传输速率 下行2.488Gbit/s,上行1.244Gbit/s
交换方式 存储-转发
背板带宽 3.2Tbit/s
MAC地址表 512K
端口参数
端口结构 非模块化
端口数量 48个
功能特性
QOS 层级化高QoS保证,H-QoS功能满足多样化商业客户的SLA要求
网络管理 支持DHCP option82,增强DHCP的安全性
支持MAC地址与端口绑定,支持IP地址与端口绑定
支持防御MAC/IP spoofing攻击
支持ONU/ONT SN(Serial Number)/Password认证
支持三重搅动(triple churing)加密的方式
GPON下行采用针对不同用户加密广播传输的方式,支持AES(Advanced Encryption Standard)128位加密
支持GPON Type B OLT 双归属
针对双上行组网,支持Smart Link及Monitor Link
安全管理 支持针对系统的DoS(Denial of Service)攻击的防御
支持MAC地址过滤功能
支持防御ICMP/IP报文攻击功能
支持源地址路由过滤功能
支持黑名单功能
其它参数
电源电压 -48V直流,支持双电源输入端口
工作电压范围:-38.4--72V
产品尺寸 490×275.8×447.2mm
环境标准 工作温度:-20-55℃
外观
MA5680T IEC业务框有21个槽位,**部配置一个风扇框。业务框通过挂耳固定在机柜中。本主题介绍华为OLT设备MA5680T IEC业务框的外观。
参数
尺寸
表1 MA5680T IEC业务框尺寸重量参数表
项目
数值
带挂耳物理尺寸(宽×深×高)
482.6mm×275.8mm×441.7mm
不带挂耳物理尺寸(宽×深×高)
442mm×275.8mm×441.7mm
较大重量(带挂耳)
30.54kg
参数
表2 MA5680T IEC业务框的电源参数
项目
参数
供电方式
直流
额定电压
-48V/-60V
工作电压范围
-38.4V~-72V
较大输入电流
40A
表3 华为MA5680T IEC业务框功耗参数表(单位:W)
典型配置
静态功耗
较大功耗
典型功耗
单板配置
P2P
1102.84
1631.55
1367.195
H802SCUN*2+H801X2CS*2+H801CITD+H801PRTE*2+H801FCBH+H802OPGD*14
GPON (H805GPBD)
724.84
917.55
821.195(1)
H802SCUN*2+H801X2CS*2+H801CITD+H801PRTE*2+H801FCBH+H805GPBD*14
GPON (H806GPBD/H806GPBH)
570.84
875.55
723.195(1)
H802SCUN*2+H801X2CS*2+H801CITD+H801PRTE*2+H801FCBH+H806GPBD/H806GPBH*14
GPON (H802SCUN+H805GPFD)
486.84
931.55
709.195(1)
H802SCUN*2+H801X2CS*2+H801CITD+H801PRTE*2+H801FCBH+H806GPBD/H805GPFD*14
GPON (H801SCUH+H805GPFD)
604.84
1099.55
852.195(1)
H801SCUH*2+H801X2CS*2+H801CITD+H801PRTE*2+H801FCBH+H806GPBD/H805GPFD*14
EPON
472.84
623.55
548.195(1)
H802SCUN*2+H801X2CS*2+H801CITD+H801PRTE*2+H801FCBH+H808EPSD*14
说明:
机框的功耗是在以下条件下测试得出:
-53.5 V DC
室温25 °C
静态功耗:设备上电,空载的功耗,所有用户端口deactivated
较大功耗:设备上电,满业务
典型功耗:约50%用户在线时的功耗
(1)此处典型功耗是在将没有接入用户的PON口关闭的情况下计算得出。
如不支持上述单板,请根据该方法使用所支持的单板计算。
配置
MA5680T IEC业务框提供21个槽位,包括14个业务板槽位、2个主控板槽位、2个电源板槽位、1个通用接口板槽位和2个上行接口板槽位。
配置
MA5680T IEC业务框支持的背板为H801MABH。
表1 槽位说明
槽位分类
槽位
可配置单板
备注
主控板槽位
7、8
主控板
2个槽位需配置相同的主控板。
上行接口板槽位(GIU)
17、18
上行接口板
支持不同上行接口板混配,推荐配置相同的上行接口板。
电源板槽位
19、20
电源板
2个槽位建议配置相同的电源板。
通用接口板槽位(GPIO)
0
通用接口板
-
业务板槽位
1~6、9~16
业务板
SPU板
以太业务接入板
TDM业务处理板
GPON业务板
10G GPON业务板
P2P接口板
EPON业务板
10G EPON业务板
支持不同业务板混配。
说明:
建议xPON单板从左到右配置,其他类型单板从右到左配置。
ESD插孔
MA5680T IEC业务框的ESD插孔位于风扇框左侧,用于连接防静电腕带,防止静电放电对设备的损害。
接地
介绍MA5680T IEC机框的接地原理和接地点位置。
注意:
地线的正确连接是MA5680T IEC机框防雷、防干扰的重要**,必须正确地接好地线。
IEC机框的电源输入端,接有噪声滤波器,其中心地与机框直接相连,称作机壳地(即保护地)。此机壳地必须良好接地,以使感应电、泄漏电能够安全流入大地,并提高整机的抗电磁干扰的能力。
连接时,用一根接地电缆将机框接地点与机房接地排或大地连接,机房的接地电阻建议小于10Ω,同时请参考国家或当地的相关标准。
中国铁塔股份有限公司江苏省分公司与国网江苏省电力有限公司战略合作签约仪式在南京举行,这是继4月24日中国铁塔与国家电网签署战略合作协议之后,全国一个在省级层面落地的铁塔系统和国网电力系统的战略合作。国网江苏电力董事长、党委书记尹积军,江苏铁塔公司党委书记、总经理李工出席了签约仪式,江苏电力副总经理陈庆,江苏铁塔副总经理戴海兵分别代表双方签署战略合作协议。
江苏电力拥有35千伏及以上变电站3112座、输电线路9.5万公里,110千伏及以上高压输电塔**过12万基,同时,江苏铁塔公司在全省累计拥有铁塔资源9万座,城区楼面资源7.5万个,在核心城区部署了丰富的楼面及机房资源。双方将深入贯彻党的*报告中提出的“创新、协调、绿色、开放、共享”的发展理念,在资源共享、技术合作、规划协作等三个方面深化合作,实现优势互补、合作共赢,共同提升社会资源利用效率,服务“强富美高”新江苏建设。
2017年,江苏铁塔和江苏电力就已尝试资源共享的创新探索与实践。2017年12月,双方合作研发的国内**220KV高压电力通信塔,在南京市建邺区泰山路与梦都大街交叉段东南角顺利建成使用,铁塔依托电力杆资源解决了该地区4G信号弱覆盖问题,电力依托铁塔机柜及电源等设施,完成了电力无线专网基站的建设。本次合作协议的签署,是双方全面开展电力和通信行业基础资源共享,推动“通信塔”和“电力塔”融合发展的里程碑,标志着“共享铁塔”在江苏从试点运行迈入全面推广的新阶段。
签约仪式上,江苏电力董事长、党委书记尹积军表示,江苏电力与江苏铁塔都是各自领域具有重要影响力的*企业,双方签署战略合作协议,将通信网络建设与智能电网建设更好结合,对江苏高端电网建设、**通信站址资源库建设具有重要的意义,为江苏电力与江苏铁塔在全国范围持续创新**创造有利条件,并对江苏经济社会发展与网络强国、数字中国、智慧社会战略实施具有积极的推动作用。
江苏铁塔党委书记、总经理李工表示,铁塔公司因共享而生,江苏铁塔成立三年多来,通过共建共享和资源整合累计减少行业重复建设**过100亿元,为通信行业提速降费提供了强力支撑,也给全省人民带来了实实在在的利益和“获得感”。未来5G基站数量将是4G的数倍,国家电网公司拥有巨大规模的杆塔资源,相当一部分可满足通信设备挂载要求,双方共享合作不仅能满足5G网络部署要求,同时符合绿色发展和协调发展理念,能带来良好的经济效益和社会效益。
根据协议,江苏电力将提供符合条件的电力杆塔等作为基础资源,为江苏铁塔建设基站等通信基础设施提供支持,共同推进电力基站合作建设;江苏铁塔将开放铁塔、楼面等基础设施、机房机柜及通道等资源,全面支撑江苏电力建设电力无线专网,并为微气象监控、输电线路在线监测、分布式能源监控等电网业务提供基础设施和信息化服务。
值得称赞的是,为了确保电力和铁塔资源共享的落地实施,双方在遵循建筑行业、电力行业、通信行业和各自技术规范的基础上,围绕安全方案、建设标准和建维模式制定了“共享及租赁实施操作方案”。该方案是全国**个规范化、标准化、流程化、体系化的操作方案,综合考虑了承重、防雷、电磁等安全因素,以及需求对接、过程实施、交付起租、运行维护等工作流程,并全面梳理了评估、设计、施工、验收等环节的技术标准和有关资质要求,为两系统间的资源共享提供了具体可操作性的指导,对全国各地的双方合作都具有重要参考价值。
电力塔和通信塔开放共享,可促进电信网络广覆盖、快覆盖,有力支撑“网络强国”战略实施,支撑4G网络覆盖和5G网络部署;推动形成电力和通信企业共建共享合作模式,促进电网企业盘活资源,提高效益,有利于国有资产保值增值和放大功能;有效减少新增通信铁塔基站占用土地资源,为建立“资源节约型、环境友好型”社会树立**。
下一步,双方将进一步完善工作机制,推动资源共享在全省范围推广实施,为铁塔公司和国家电网公司合作提供江苏样板,为江苏经济社会发展与人民美好生活做出更大贡献。
The strategic cooperation signing ceremony of the China iron tower Limited by Share Ltd Jiangsu branch and the national network Jiangsu Electric Power Co., Ltd. was held in Nanjing. This is the strategic cooperation of the first national tower system and the national network power system at the provincial level following the strategic cooperation agreement signed by the China Tower and the national grid in April 24th. Yin Jijun, chairman of Jiangsu electric power network, Party Secretary of the Party committee, Secretary of the Party committee of Jiangsu iron tower company and general manager Li Gong attended the signing ceremony, Chen Qing, deputy general manager of Jiangsu electric power, and Dai Haibing, deputy general manager of Jiangsu iron tower, signed the strategic cooperation agreement between the two sides respectively.
Jiangsu electric power has 35 thousand volts and more substations 3112, transmission lines 95 thousand kilometers, 110 thousand volts and above the high voltage transmission tower over 12 million. At the same time, Jiangsu iron tower company has a total of 90 thousand iron tower resources in the province, urban floor resources 75 thousand, in the core area of the deployment of rich floor and machine room resources. The two sides will deeply implement the concept of "innovation, coordination, green, open and shared" in the nineteen major reports of the party. We will deepen cooperation in three aspects, such as resource sharing, technical cooperation and planning and cooperation, to achieve complementary advantages and win-win cooperation, to jointly improve the efficiency of the utilization of social resources, and to serve "strong wealth and high". The construction of Jiangsu.
In 2017, the Jiangsu tower and Jiangsu electric power have tried to explore and practice resource sharing innovation. In December 2017, the first domestic 220KV high voltage power communication tower, developed by both sides, was successfully used in the southeast corner of the Taishan road in Jianye District, Nanjing and the southeast corner of the cross section of Meng Du street. The tower relies on the power pole resources to solve the problem of weak 4G ** coverage in this area. Electric power relies on the tower cabinet and power supply to complete the electric power wireless. The construction of a special network base station. The signing of this cooperation agreement is a milestone for the two sides to fully share the basic resources of the power and communications industry and promote the integration and development of the "communication tower" and the "power tower", marking the new stage of "shared iron tower" in Jiangsu from pilot operation into a comprehensive promotion.
At the signing ceremony, Yin Jijun, chairman of Jiangsu electric power and party secretary of the Party committee, said that both Jiangsu electric power and Jiangsu tower were leading enterprises with important influence in their respective fields. The two sides signed strategic cooperation agreements to better combine the construction of communication network with the construction of smart grid, the construction of high-end power grid in Jiangsu, and a million level communication site. The construction of resource base is of great significance. It creates favorable conditions for Jiangsu electric power and Jiangsu iron tower to continue to innovate and lead the country continuously, and has a positive role in promoting the economic and social development of Jiangsu and the implementation of the network power, digital China, and the implementation of the intelligent society.
Li Gong, the Secretary and general manager of the Party committee of the Jiangsu iron tower, said that the tower company was born for sharing, and the tower of Jiangsu was established for more than three years. The construction and sharing and integration of resources have been reduced by more than 10 billion yuan, which has provided a strong support to the speed reduction of the communications industry, and also brought real benefits to the people of the whole province. "Sense of gain". The number of 5G base stations in the future will be several times as many as 4G. The national Power Grid Corp has a huge scale of tower and tower resources, a considerable portion of which can meet the requirements for the mounting of communication equipment. The sharing of cooperation between the two sides not only meets the requirements of 5G network deployment, but also meets the concept of green development and coordinated development, and can bring good economic and social benefits.
According to the agreement, Jiangsu electric power will provide the basic resources, such as the electric power pole and tower that meet the conditions, support the communication infrastructure such as the construction of the base station of the Jiangsu iron tower, and jointly promote the cooperation and construction of the power station. The Jiangsu tower will open the infrastructure of the tower and floor and other infrastructure, the machine cabinet and the channel and so on to support the Jiangsu electricity in an all-round way. It builds power wireless special network, and provides infrastructure and information services for micro weather monitoring, on-line monitoring of transmission lines, distributed energy monitoring and so on.
It is commendable that, in order to ensure the implementation of the sharing of power and tower resources, the two sides have formulated "sharing and leasing implementation exercises" on the basis of the construction industry, the electric power industry, the communications industry and the respective technical specifications. The scheme is the first standardized, standardized, process and systematized operation scheme in the country. It takes into account the safety factors such as load bearing, lightning protection and electromagnetic, as well as the working process of demand docking, process implementation, delivery rent, operation and maintenance, and comprehensively combs the techniques of evaluation, design, construction and acceptance. Standards and related qualification requirements provide specific and operable guidance for the sharing of resources between the two systems. It is of great reference value for both sides of the country to cooperate.
The open sharing of power towers and communication towers can promote the wide coverage and rapid coverage of telecommunications networks, support the implementation of the "network power" strategy, support the 4G network coverage and 5G network deployment, promote the formation and sharing of cooperation models for electric power and communication enterprises, promote the grid enterprises to revitalize the resources, improve the efficiency and benefit the state-owned assets protection. Value added and amplification function; effectively reduce the new communication iron tower base station occupation of land resources, for the establishment of a "resource-saving, environmentally friendly" society to establish a model.
The next step, the two sides will further improve the working mechanism, promote the sharing of resources in the province to promote the implementation of the whole province, for the tower company and the national household electrical appliances network company to provide Jiangsu model, Jiangsu economic and social development and better life for the people to make greater contributions.